Agent
+more
Shanghai Hao Building Materials Co., Ltd. is a "brand quality, service to win customers"......
 Contact Us
+more
Address: 5308 Gong He Xin Road, Shanghai, Lane 32, 4D Zip Code: 200435 Tel :021-56423020 Website: http://www.haozheng.com.cn E-mail: sales@haozheng.com.cn
 News
 
Special support for building energy efficiency projects in Shanghai Interim Measures
Shanghai United 〔2009〕 establishment of diplomatic relations 816
All the units:
According to "Shanghai Municipal Administration of special funds for energy conservation," the relevant provisions of the Shanghai Construction and Traffic Commission in conjunction with Shanghai Municipal Development and Reform Commission, Shanghai Municipal Financial Bureau developed a "special support in Shanghai Building Energy Efficiency Project Interim Measures", is issued to you, please comply.
 
Municipal Construction and Transportation Committee Municipal Development and Reform Commission, Finance Bureau
July 8, 2009
    
Special support for building energy efficiency projects in Shanghai Interim Measures
To further increase the city's efforts to promote building energy efficiency, building energy efficiency standard to support the use of funds management, under the "Special Fund of Shanghai Administration of energy saving," the relevant provisions formulated.
 
 
First, sources of funding
The term of the Building Energy Efficiency Project special support fund (hereinafter referred to as support funds) is the capital city of the special energy saving in building energy efficiency projects to support the city's financial capital.
 
Second, support the principle of
Support the use and management of funds should follow the following principles:
(A) help cultivate the city building energy efficiency demonstration projects;
(B) help improve the city building energy efficiency;
(C) to mobilize the participation of all building energy efficiency initiative;
(D) helps to improve the city's building energy management system.
 
Third, to support range
 
(A) building energy efficiency demonstration projects
Energy efficiency standards to 65% or more of the new residential buildings and public buildings demonstration projects. Building Size: residential building, building area of 50,000 square meters or more; public buildings, single building over an area of 20,000 square meters.
Energy efficiency standards to 50% or more of the existing residential buildings and public buildings energy-saving demonstration project. Building Size: residential building, building area of 10,000 square meters or more; public buildings, single building over an area of 20,000 square meters, of which state organs single office building area of 2000 square meters.
 
(B) solar energy, shallow geothermal energy and other renewable energy and building integrated residential buildings or public buildings pilot project.
Use of a renewable energy, residential building construction area of 50,000 square meters or more, public buildings over 20,000 square meters building area; use two or more renewable energy, building area of 10,000 square meters or more.
 
(C) of "State organs Shanghai office buildings and large public building energy monitoring system work program" (Shanghai diplomatic Union [2008] 77) the requirements of national authorities to carry out office buildings and large public buildings of energy statistics, energy audits, energy efficiency, publicity and sub-metering and so on.
 
Fourth, support for standards and methods
(A) comply with the scope of the first projects to support, among them: new residential buildings and public buildings pilot project, the maximum subsidy per square meter 50. Reconstruction of existing residential building energy efficiency demonstration projects, the maximum subsidy 100 yuan per square meter; existing public buildings energy-saving demonstration project, the maximum subsidy per square meter 50.
(B) the scope of the second line support for the project, the maximum subsidy per square meter 50.
(C) have the support of individual items in the range of two or more conditions, one can only enjoy the subsidy.
(D) the total amount of subsidies a single project does not more than 5 million yuan.
(E) funds from other sources to support the project, not repeat the declaration, the State specifically require local matching funds unless the project.
(Vi) the scope of the third line support for the project, according to the Ministry of Finance "on the issuance of state organs, public buildings, office buildings and large energy Interim Measures on Management of special funds" (wealth building [2007] No. 558) provides special funds for central government local government will provide appropriate support.
 
5, reporting procedures and project review
Project undertaking unit of the Shanghai Construction and Traffic Authority (hereinafter referred to as Municipal Construction and Transportation Committee) to submit a written application and related materials.
Municipal Construction and Transportation Committee report with the relevant sector organizations, on the preliminary report of the project, has organized experts to conduct the assessment, and evaluation of projects through review.
Once approved, the project will be construction traffic in the city known to the public to the Committee web site (jsjtw.sh.gov.cn), publicity for 15 days, no objection to the inclusion of building energy efficiency projects in Shanghai special support fund use plan.
 
6, support the use of funds scheme
Project undertaking unit shall be by the end of July of each year prior to the Municipal Construction and Transportation Committee report next year plans to support funding of money. Municipal Construction and Transportation Committee after the annual audit summary prepared by the end of September next year before the use of funds to support programs, energy conservation, reported the Shanghai Leading Group Office (hereinafter referred to as municipal energy conservation office) to determine. Polyurethane Foam Sealant
7, contract management
Municipal Construction and Transportation Committee on the use of the funds identified for inclusion in supporting energy saving projects implemented Jihua De Jian Zhu project contract management, and with the project take Danwei contract Mingque project name, take Zhuti, performance period, main content, expected energy saving goal for the content of the performance Ping Gu, support and specific support means the total amount, payment terms, breach of contract and so on. Project undertaking unit shall strictly implement the relevant terms of the contract.
Building energy efficiency project implementation, due to special circumstances need to change or cancellation, the project undertaking unit of the original reporting procedures shall be submitted for approval.
 
8, energy efficiency evaluation requirements
Project undertaking unit shall and Commerce "civil Interim Measures of energy efficiency evaluation and labeling" requirement, to carry out building energy efficiency evaluation and labeling project work.
 
9, review and issued capital
(A) of the project undertaking unit of the contractual construction traffic to the City Commission proposed to apply paragraph, municipal construction and transportation committee on building energy-saving projects for special review and issued its opinion, the Shanghai Financial Bureau of the project according to an audit opinion to support 50% of funds allocated to the project undertaker.
(B) of the project is completed, the City Construction and Transportation Committee to review the project and the final audit opinion issued by the Shanghai Municipal Financial Bureau of Construction and Transportation Committee under the views of the project to support the remaining funds allocated to the project undertaker.
 
10, supervision and management
        
(A) of the Municipal Construction and Transportation Committee is responsible for building energy efficiency to support the project supervision and management.
    
(B) of the Municipal Office in charge of building energy saving energy saving projects conducted to support sampling.
    
(C) Municipal Finance Bureau and Shanghai Municipal Audit Bureau is responsible for supporting the use of funds and project implementation monitoring and auditing.
(D) of the funds must be earmarked to support any unit may withhold or embezzle. On fraud, falsely claimed or withheld, misappropriated, the funds remaining to support, once verified, will resume support funds, according to relevant stipulations for processing.
 
11, Annex
(A) of the Municipal Construction and Transportation Committee this way, the municipal finance bureau is responsible for interpretation;
(B) These Measures shall go into effect.
Url:http://www.haozheng.com.cn/en/news/567.htm

上一篇:没有了
下一篇:Shanghai seven effective energ ..

SHANGHAI HAOZHENG BUILDING MATERIALS Co.,Ltd Copyright © 2010 All Right Servered.